Comments |
Blacktop to concrete panels launch. There are two boarding docks and there is an ADA designated unloading area at the dock approach to the right. There is one, designated, ADA accessible parking stall at the launch site. There is an upper area for all other vehicle/trailer parking. No power loading. No camping or overnight parking.
|